1. Boring: To ensure accurate boring of the pile, four reference points should be established, forming two perpendicular lines, with each point located 1.5 meters from the pile center. Initially, bore a 2-meter depth using a cutting tool of the desired pile diameter. Subsequently, continue boring as per sub-soil investigation report, employing a liner, Bentonite, or a combination as needed. A temporary guide casing, app. 2 meters in length with an outside diameter matching the nominal pile diameter, should be lowered into the borehole. Ensure that the diameter of the cutting tool is slightly smaller, up to a maximum of >75 mm the outside diameter of the casing, to allow free movement within the casing during operation. Check and adjust the position and alignment casing of guide with respect to the fixed reference points around location of pile to avoid deviation from the exact pile location. Boring should proceed upto the the hard strata where foundation is placed as specified in th...